Afghan Solar

  • Home
  • Projects
  • Batteries
  • FAQ
  • Company
  • Contact
  • Panel
    Batteries
    Charge Controllers
    Solar Inverters/UPS
    Solar Office Power Solutions
    Lightning
    Accessories
  • Solar Home Lightning
    Solar LED Street Light System
    Solar Telecommunication System
    Solar Water Heating System
    Solar Office Power Solutions
    Solar Billboard Lighting System
    Solar Water Pump
  • strict warning: Non-static method view::load() should not be called statically in /home/afghansolar/public_html/sites/all/modules/views/views.module on line 842.
  • strict warning: Declaration of content_handler_field::options() should be compatible with views_object::options() in /home/afghansolar/public_html/sites/all/modules/cck/includes/views/handlers/content_handler_field.inc on line 208.
  • strict warning: Declaration of views_handler_filter::options_validate() should be compatible with views_handler::options_validate($form, &$form_state) in /home/afghansolar/public_html/sites/all/modules/views/handlers/views_handler_filter.inc on line 589.
  • strict warning: Declaration of views_handler_filter::options_submit() should be compatible with views_handler::options_submit($form, &$form_state) in /home/afghansolar/public_html/sites/all/modules/views/handlers/views_handler_filter.inc on line 589.
  • strict warning: Declaration of views_handler_filter_boolean_operator::value_validate() should be compatible with views_handler_filter::value_validate($form, &$form_state) in /home/afghansolar/public_html/sites/all/modules/views/handlers/views_handler_filter_boolean_operator.inc on line 149.
  • strict warning: Declaration of views_plugin_style_default::options() should be compatible with views_object::options() in /home/afghansolar/public_html/sites/all/modules/views/plugins/views_plugin_style_default.inc on line 25.
  • strict warning: Declaration of views_plugin_row::options_validate() should be compatible with views_plugin::options_validate(&$form, &$form_state) in /home/afghansolar/public_html/sites/all/modules/views/plugins/views_plugin_row.inc on line 135.
  • strict warning: Declaration of views_plugin_row::options_submit() should be compatible with views_plugin::options_submit(&$form, &$form_state) in /home/afghansolar/public_html/sites/all/modules/views/plugins/views_plugin_row.inc on line 135.
  • strict warning: Non-static method view::load() should not be called statically in /home/afghansolar/public_html/sites/all/modules/views/views.module on line 842.
  • strict warning: Declaration of views_handler_argument::init() should be compatible with views_handler::init(&$view, $options) in /home/afghansolar/public_html/sites/all/modules/views/handlers/views_handler_argument.inc on line 745.
  • strict warning: Non-static method view::load() should not be called statically in /home/afghansolar/public_html/sites/all/modules/views/views.module on line 842.
  • strict warning: Non-static method view::load() should not be called statically in /home/afghansolar/public_html/sites/all/modules/views/views.module on line 842.

Clinics Electrification

System Size 5 KW

Panels Used BP 175 W

Clinics Electrification Across Afghanistan

A 5 KW solar solution for Clinics across Afghanistan.  To provide the electricity required at each selected clinic.  Ongoing project. 

Solar Water Pumps

System Size Various

Panels Used Various

Solar Water Pumps have been installed throughout the country. Pumps such as Grundfos and Shurflo have been used.

Solar Refrigerator Solution

System Size Various

Panels Used Various

Solar Refrigerators have been installed at various clients throughout the country in locations such as clinics, hospitals, etc.

  • « first
  • ‹ previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • …
  • next ›
  • last »

Contact© 2011 afghansolar.com. All rights reserved.

Contact